electronicrepairksa.shop

Habess thrmol Engineering

NDT (Non-Destructive Testing) Equipment Repair PWHT (Post Weld Heat Treatment) Equipment Maintenance Power Supply Units Repair and Testing PCB (Printed Circuit Board) Repair and Troubleshooting Custom Design and Fabrication of New PCBs

completion in Pakistan

  • Pakistan Refinery Karachi Shutdown
  • National Refinery Karachi Shutdown
  • Caltex Petroleum Storage Plant, Karachi
  • Port Qasim Power Plant, unit 3/4/5 Boiler and Turbine Area, Karachi
  • PTA Plant Port Qasim, Karachi
  • Sadiqabad FFC Plant 2

And many other projects and shutdowns in Pakistan

Kingdom of Saudi Arabia Project Completion

Pietro Rabigh Refining & Petrochemical Company 

Saserref Oil Refinery, Jubail Industrial City

Saudi Kayan Petrochemical, Jubail Industrial City

Jana Petrochemical Jubail Industrial City

Total Refinery and Petrochemical Jubial Industrial City

And Different Project Completion in Saudi Arabia

The scope of work included the controlled heating and cooling of welded joints to relieve residual stresses,

The process was carried out using calibrated equipment with accurate thermal control. T. Calibration certificates for equipment and instruments were provided and verified before execution. The PWHT cycle charts were reviewed and accepted by the client representative.

Verification of the weld joint and preparation before PWHT

Installation of thermocouples as per the holding time and heat coverage requirement

Arrangement of insulation and heating elements for uniform heat distribution

Controlled heating cycle to reach the specified soaking temperature

Maintaining a soak period based on material thickness and code specification

Controlled cooling rate to avoid metallurgical distortion

Post-heat treatment inspection and documentation